House of Week; 653 Bonair Street

6750-draper-avenue-greatroom

Picture 2 of 3

Two Homes for the Price of One!

Two single family detached homes on one lot. Located just two blocks from Windansea Beach.

653 Bonair Street – Front Unit

3 Bedrooms / 1 Bathrooms. 1,115 Square Feet. 2 Car Attached Garage.

6750 Draper Avenue

1 Bedroom + Spacious Loft / 2 Bathrooms. 785 Square Feet Living Space. 2 Off Street Parking Spaces.

Offered At $1,199,000

Jeff DeChamplain
Real Living Lifestyles
858-883-3324
www.RealEstateSurfReport.com

Related posts:

  1. La Jolla Home of the Week: 939 Coast #17A
  2. La Jolla House of the Week: 7650 and 7652 La Jolla Blvd.
  3. House of the week: 1320 W. Muirlands Drive
  4. Magnificent oceanfront home in La Jolla
  5. House of the Week: 6092 Avenida Chamnez

Short URL: http://www.lajollalight.com/?p=93318

Posted by Staff on Aug 8, 2012. Filed under Featured House of the week, House of the Week. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

Bottom Buttons 1

Bottom Buttons 2

Bottom Buttons 3

Bottom Buttons 4

Bottom Buttons 5

Bottom Buttons 6

RSS North Coastal News

  • Congregation Beth Am Labor Day Picnic September 2, 2014
    Congregation Beth Am held a festive Labor Day Picnic Sept. 1. This year is the 31st anniversary of this synagogue that started in a tire store in Solana Beach. […]
  • Suspects attempt to rob Solana Beach bank ATM September 2, 2014
    An attempt to break into an ATM at a Solana Beach bank branch early Sept. 2 using a cutting torch ended with the cash machine in flames and two suspects fleeing empty-handed. The suspects set off the ATM's alarm during the failed heist shortly after 2:30 a.m. in the 600 block of Lomas Santa Fe Drive near Glencrest Drive, according to sheriff's Lt. […]
  • First phase of Earl Warren Middle School reconstruction begins in Solana Beach September 2, 2014
    As kids kicked back this summer, San Dieguito Union High School District kicked off the first phase of its complete reconstruction of Earl Warren Middle School. The $41 million project is made possible by the passage of Proposition AA. […]