House of Week; 7555 Eads Avenue, Unit 11

7555-eads-11-living

Picture 2 of 3

7555 Eads Avenue Unit 11

Open Sunday 1-4 PM

  • Penthouse Unit
  • 2 Bedrooms/ 2 Full Baths
  • Spacious Kitchen with Granite Counters,
  • Stainless Appliances, and Custom Cabinets
  • Large Master Suite with Sliding Doors to
  • the Covered Balcony
  • Custom Built-ins in the Second Bedroom
  • Automatic Lighting and Custom Shades
  • Beautiful Covered Balcony to enjoy Sunsets
  • Great location to all La Jolla Village Amenities
  • 2 Covered Parking Spaces
  • $1,249,000

Related posts:

  1. House of Week; 1492 Cottontail Lane
  2. Bright and Elegant Gated Community
  3. HOME OF THE WEEK: 8819 Caminito Sueño
  4. House of the week: 305 Sea Lane
  5. House of the Week: 1009 Solymar, La Jolla 92037

Short URL: http://www.lajollalight.com/?p=63256

Posted by Staff on May 1, 2012. Filed under Featured House of the week, House of the Week. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

Bottom Buttons 1

Bottom Buttons 2

Bottom Buttons 3

Bottom Buttons 4

Bottom Buttons 5

Bottom Buttons 6

RSS North Coastal News

  • Congregation Beth Am Labor Day Picnic September 2, 2014
    Congregation Beth Am held a festive Labor Day Picnic Sept. 1. This year is the 31st anniversary of this synagogue that started in a tire store in Solana Beach. […]
  • Suspects attempt to rob Solana Beach bank ATM September 2, 2014
    An attempt to break into an ATM at a Solana Beach bank branch early Sept. 2 using a cutting torch ended with the cash machine in flames and two suspects fleeing empty-handed. The suspects set off the ATM's alarm during the failed heist shortly after 2:30 a.m. in the 600 block of Lomas Santa Fe Drive near Glencrest Drive, according to sheriff's Lt. […]
  • First phase of Earl Warren Middle School reconstruction begins in Solana Beach September 2, 2014
    As kids kicked back this summer, San Dieguito Union High School District kicked off the first phase of its complete reconstruction of Earl Warren Middle School. The $41 million project is made possible by the passage of Proposition AA. […]