Chargers make two roster moves


Press Release

The San Diego Chargers added wide receiver Seyi Ajirotutu to the active roster and place linebacker Kion Wilson to Reserve-Injured due to an ankle injury. Wilson injured his ankle in Friday’s practice and becomes the fifth linebacker on the Chargers’ Reserve-Injured list.

Ajirotutu is a 6-3, 211-pound rookie from Fresno State who spent the first six weeks of the season on the team’s practice squad. He caught seven passes for 145 yards in the preseason.

— Source: San Diego Chargers

Related posts:

  1. San Diego blackout lifted for Chargers-Patriots game
  2. Chargers sign kicker as Kaeding recovers from groin injury
  3. Merriman placed on reserve-injured list
  4. Chargers add receiver to active list
  5. Chargers adjust roster, sign fourth long snapper

Short URL: http://www.lajollalight.com/?p=4363

Posted by Kathy Day on Oct 26, 2010. Filed under Professional, Sports. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

La Jolla Community Calendar

Facebook

Bottom Buttons 1

Bottom Buttons 2

Bottom Buttons 3

Bottom Buttons 4

Bottom Buttons 5

Bottom Buttons 6

RSS North Coastal News

  • Congregation Beth Am Labor Day Picnic September 2, 2014
    Congregation Beth Am held a festive Labor Day Picnic Sept. 1. This year is the 31st anniversary of this synagogue that started in a tire store in Solana Beach. […]
  • Suspects attempt to rob Solana Beach bank ATM September 2, 2014
    An attempt to break into an ATM at a Solana Beach bank branch early Sept. 2 using a cutting torch ended with the cash machine in flames and two suspects fleeing empty-handed. The suspects set off the ATM's alarm during the failed heist shortly after 2:30 a.m. in the 600 block of Lomas Santa Fe Drive near Glencrest Drive, according to sheriff's Lt. […]
  • First phase of Earl Warren Middle School reconstruction begins in Solana Beach September 2, 2014
    As kids kicked back this summer, San Dieguito Union High School District kicked off the first phase of its complete reconstruction of Earl Warren Middle School. The $41 million project is made possible by the passage of Proposition AA. […]